Completion of bridge rehabilitation postponed—again

The full opening of the Martin Luther King Jr. Drive bridge over the Schuylkill River has again been pushed later, this time to 2025. The bridge, which connects MLK Drive through Fairmount Park West to the Eakins Oval, has been closed since 2020 as part of a project to make repairs to the bridge’s structure,

More
1 min read
////

Advocates express concern about artificial turf’s carcinogenic chemicals, contributions to heat island effect and plastic waste

Much of the opposition to the FDR Park Master Plan centers on the replacement of the open greenspace of the Meadows with the artificial green of 12 synthetic turf athletic fields. Master Plan boosters cite the “playability” of synthetic turf fields, which can host more hours of play per week than natural grass fields. Recent

More
6 mins read
/

Comment on Lower Poquessing Creek Trail proposal

The Far Northeast of Philadelphia isn’t the friendliest cycling landscape the city has to offer, with intimidating arterial roads like Roosevelt Boulevard and lots of residential streets that don’t connect. The proposed Lower Poquessing Creek Trail aims to change that, at least along the creek that serves as the city’s boundary with Bucks County. The

More
1 min read

Fossil fuel lobbying threatens decarbonization prospects

Who expected the fossil fuel industry to fight fair? In 2021 12.2% of the energy used in the United States came from renewable sources, as did 20.1% of our electricity generation, according to the US Energy Information Administration. And that is projected to grow. Facing a shrinking share of the energy pie, the fossil fuel

More
1 min read
1 … 19 20 21 22 23 … 33